Class 90

The Class 90 were the last locomotives ordered by BR before sectorisation [1]. The Class 90 was a development of the Class 87 (and indeed originally were to have been called the Class 87/2 - though the final result was sufficiently different to lead to the creation of a new class). They replaced the first generation AC Electric locos (Classes 81-85s). The Class 90s are mixed traffic locomotives and have been used on express passenger and heavy freight services [2]. Though these days usually on the latter.

Class 90

Freightliner 90 012 and 045 pass Stafford

Information
Number built: 50
Built: 1987-90
Builder: BREL Crewe
Engine: GEC G412CY traction motors (25kV AC OLHE)
Power: 5, 000 hp (3, 728 kW) - continuous
7, 860 hp (5, 861 kW) - maximum
Wheel arrangement: Bo-Bo

As built, they were capable of 110mp/h but just over half the class became dedicated freight locomotives (Class 90/1) with the top speed reduced to 75mp/h, on these locomotives the electric train heating was also isolated and the brakes improved. After privatisation these were eventually converted back to 90/0 (though some were reclassified as 90/2 for a time).

Class 90

90 018 in special retro Freightliner livery

The Class 90 currently serves with Locomotive Services, Freightliner and DB Cargo. They have also served with Grand Central, Greater Anglia, GNER and Virgin Trains in the past. A small number have been scrapped, some others are currently stored though the rest can be regularly seen on freight trains and charters.

Class 90

90 012 and friend pass through light engine

Class 90

DB 90 046 leads a friend through Stafford

Class 90

90 and 66 front end comparison

Class 90

Freightliner 90 044 at Stafford

[1] Gavin Morrison, AC Electric Locomotives (Ian Allan, 2013) p. 59
[2] Colin J Marsden, Traction Recognition (2nd Edition) (Ian Allan, 2008) p. 90