Class 769 Flex

In the mid-2010s there was a need for diesel multiple units to replace life-expired stock such as the Pacer family, but (at the time) there was little prospect of new DMUs being built. Instead, Porterbrook in conjunction with Northern, sought to fill the gap by converting surplus Class 319 electric multiple units into bi-mode multiple units with diesel power packs. The result was the Class 769 Flex which retains it's EMU systems (indeed the two diesels feed power into the unit's existing traction system) and so can take it's power from electrified lines where available.

Class 769 Flex

Northern 769 424 at Southport

Information
Number built: 36 (Conversions from Class 319)
Built: 2017-21 (Original build 1987-90)
Builder: Brush Traction (conversions)
Engine: 2 MAN D2876 diesels
Power: 1, 046 hp (780 kW)

Work began at Brush's Loughborough Works in 2017 with Class 769s ordered by Northern, Transport for Wales and Great Western Railway (GWR examples were to have been "tri-mode" as they were to be able to take their power from diesel and both overhead and third rail). Testing of the first example 769 began in 2018 however, the development of the trains was not been trouble free to say the least and there were numerous delays and reliability problems. Northern hoped to start using their Class 769s in 2019 but this was delayed until 2021.

Class 769 Flex

Ex-TfW 769 452 on it's way to storage, seen at Stafford

Transport for Wales' units entered service in 2020 though were not without technical issues and have now been withdrawn due to being surplus to requirements. Despite there being no prospect of new diesel multiple units being built when the 769 project began, new DMUs have now been built in the Civity family. GWR never operated their 769s though did test them for a time. The 769 remains in service only with Northern at this point.

Class 769 Flex

GWR 769 959 on test at Guildford

A parcel carrying version of the unit is the Class 768.

Class 769 Flex

769 424 and 150 118 at Southport